Carpentry Project #3: Day II

On Saturday, I finished up getting the concrete blocks leveled. That was quite hard work. The boards in the picture were only used for leveling purposes at this point (although they get used for their purpose soon).

After getting the blocks level, I starting working on the floor frame. After getting the band joists assembled, I set them on the blocks and checked the level. Everything still looked pretty good, but there were a few spots that I still needed to ship up a little (I think this had more to do with slight bowing in the mudsills than the blocks being unlevel.). Anyway, once I got that taken care of, I started putting in the joists. I worked until it was too dark to see pencil markings or nail heads and got all but two of the joists put in.



This entry was posted in Uncategorized and tagged , . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong> <pre lang="" line="" escaped="">